Architectural Design Archive
Feedback
Feedback: Parallel industry at the harbour of Cadiz.

The Project is first an strategy and then it becomes an architecture.
It is based on an analysys of the harbour, its buildings, its program and its surfaces to introduce three larger urban scale interventions and five industrial buildings, connected by a traffic infrastructure.
The proposed architecture is designed systematically, so that it can be similar in each building or any future construction at the harbour. These constructive and structural solutions are: the steel structure, the double skin facade, the light policarbonate skin, the division between the human and industrial scale and the design of the installations.